document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
该文章免费阅读,以下是该文章的全部内容:<\/span><\/td>"); document.writeln(" <\/tr>"); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln("

市“六个走在前列”重大项目协调办公室:
  根据我市今年重大商务项目建设情况,拟安排****县人民政府在全市“六个走在前列”重大项目讲评会议上作表态发言,理由如下:
  ****县的****农产品物流中心项目是2013年****市级重大项目、****市现代服务业综合试点龙头项目。今年以来,该项目受国土、规划、拆迁等问题的影响,进展较为缓慢。****市现代服务业综合试点领导小组办公室已在8月初对****县人民政府下发了解决该项目相关问题的交办函,虽****县人民政府为解决项目问题做了大量的工作,部分问题已得到解决,但仍存在一些问题,主要包括一是项目范围内还有27栋房屋未完成拆迁,109亩配套用地还有部分苗园未完成搬迁;二是项目二期400亩用地的调整报批工作未完成,项目用地无法进行摘牌等相关工作;三是项目用地外围的基础设施还不完善,应尽快完善黄兴镇市场群四周的水、电、气以及交通网络的建设;四是黄江公路标高和地下管网尚未确定,无法开展项目土方招标工作。请****县人民政府高度重视,尽快拿出一套切实可行的解决方案,切实推进项目的建设。
  特此致函。

                     ****市商务局
                     ****年*月*日